Projects Background

Our Projects

Explore our completed projects and achievements.

Rainwater Harvesting

Rainwater Harvesting Projects

Completed
Medispray Laboratories campus view
Medispray Laboratories logo

Pharmaceutical Manufacturing

Medispray Laboratories

Satara, Maharashtra

Model

Rainwater Artificial Reverse Borewell Recharge

SWD Model

02 Nos

Depth of Reverse Borewell

50 Mtr

Estimated Percolation Rate

1.80 KL/hr

Estimated Recharge in 2 Pit

31536 KL/yr

Status

Commissioned

Project data

Total Plot Area

Acre

Average Rainfall

724.04 mm

Possible Rainfall Runoff

21096 KL/yr

Estimated Recharge in 2 Pit

31536 KL/yr

Advantages

Groundwater level improvement, TDS reduced by fresh rainwater delusions

Snapshots from live installs

Medispray Laboratories field work 1
Medispray Laboratories field work 2
Medispray Laboratories field work 3
Completed
Morgan (Morganite) Advanced Materials Campus campus view
Morgan (Morganite) Advanced Materials Campus logo

Advanced Materials & Ceramics

Morgan (Morganite) Advanced Materials Campus

Kolhapur, Maharashtra

Model

Rainwater Reuse Model

Rainwater Storage

500 KL

Estimated Reuse Cycle

100 KLD

Estimated Reuse

8500 KL/yr

Monitoring

V-Notch Online (02 Nos)

Project data

Total Plot Area

16.00 Acre

Average Rainfall

693 mm

Possible Rainfall Runoff

21096 KL/yr

De-siltation Model

02 Nos

Filtration Junction Model

04 Nos

Primary Collection Sump

54 KL

Note

Full atomization with IoT-based data monitoring

Snapshots from live installs

Morgan (Morganite) Advanced Materials Campus field work 1
Morgan (Morganite) Advanced Materials Campus field work 2
Morgan (Morganite) Advanced Materials Campus field work 3
Completed
Yazaki Kesanand campus view
Yazaki Kesanand logo

Automotive Components Manufacturing

Yazaki Kesanand

Kesanand, Maharashtra

Model

Rainwater Artificial Reverse Borewell Recharge

Scope

Comprehensive RWH with filtration

Monitoring

Ultrasonic flow meter system

Project data

Total Plot Area

11.6 Acre

Average Rainfall

763.74 mm

Possible Rainwater Runoff

26,750.75 KL/YR

Depth of Reverse Recharge Well

65 MTR

No of Bore Well

7

Estimated Recharge

4,092 KL/YR

Estimated Reuse

20,460 KL/YR

RWH Pit

6 Number

Snapshots from live installs

Yazaki Kesanand field work 1
Yazaki Kesanand field work 2
Yazaki Kesanand field work 3
Completed
The Supreme Industries Limited campus view
The Supreme Industries Limited logo

Manufacturing

The Supreme Industries Limited

Maharashtra

Model

Rainwater Artificial Reverse Borewell Recharge

Scope

RWH with ProEco filtration modules

Monitoring

Ultrasonic flow meter

Project data

Total Plot Area

12 Acre

Average Rainfall

1377.42 mm

Possible Rainwater Runoff

6136.12 KL/YR

Depth of Reverse Recharge Well

80 MTR

No of Bore Well

1

RWH Pit

4 Number

Snapshots from live installs

The Supreme Industries Limited field work 1
The Supreme Industries Limited field work 2
The Supreme Industries Limited field work 3

Residential & Commercial

Building Segments

Ambrosia Galaxy by Divyasparsha Group

Ambrosia Galaxy by Divyasparsha Group

Baner, Pune

Filter Installed - Modular Sand filter Inline Cartridge Model

Reality 7

Reality 7

Sadashiv Peth, Pune

Filter Installed - Modular Sand filter Inline Cartridge Model 400/S

Akar Infra Structure

Akar Infra Structure

Ratnagiri

Filter Installed - Rain Water Harvesting Inline Filter FL150,V wire Screen with sand & gravel filter media

Mahesh Housing Society

Mahesh Housing Society

Sangli

Filter Installed - FL 150

Have a site that deserves the same attention?

Share your drawings or compliance letters and our engineering team will map an executable rainwater strategy within days.